CN4148380 · Latest observed version

Stubble management is a significant issue in Western Australia particularly in the high rainfall zone, where it is not uncommon for cereal yields to reach over 7 t/ha with the resulting stubble loads being up to 10 t/ha. This is a high amount of stubble residue left post harvest and is an increasing concern for local growers due to poor establishment of following crops, nitrogen (N) tie-up, disease carryover issues and seeding operation inefficiencies such as, blockages, hair pinning, poor soil throw and bulldozing. As a result, plant establishment has become increasingly difficult, particularly Canola establishment. Traditionally, high stubble loads in the region have been removed by burning, however, there has been a move away from burning due to a combination of social license issues, as well as farming system concerns. Burning increases the risk of erosion and nutrient loss and decreases soil moisture. Growers are also concerned with Nitrogen (N) tie-up from retained crop stubble. Although cereal stubbles contribute very little N to the following crop, stubbles are a source of carbon and N is required from the soil to breakdown this high carbon material. Previous GRDC research has been conducted to understand the additional N requirements needed to overcome early N immobilisation by stubble, this research suggests that an additional 5-6 kg N/t of cereal residue can help overcome the issues of stubble N immobilisation. (https://grdc.com.au/resources-and-publications/grdc-update-papers/tab-content/grdc-update-papers/2018/02/the-effect-of-stubble-on-nitrogen-tie-up-and-supply). Investigation into whether the addition of nutrients, in addition to an enzyme ‘digester’ to stubble in conjunction with mechanical stubble treatments, during the summer fallow period, can increase the rate of stubble breakdown to allow for improved winter crop establishment (especially canola) and reduction in early season nitrogen tie-up. Reduced carryover of stubble-borne diseases could also be explored via observations

$235,988.00

Full reported contract value · AUD including applicable GST · 2025-02-25 to 2026-07-07

Reporting agency
Grains Research and Development Corporation
Reported supplier
Stirlings to Coast Farmers
Reported ABN
62 911 881 574. Exemption as supplied: No.
Category
Crop production and management and protection
Procurement method
Limited tender
Original publication
2025-05-01 12:59:00 (ACT local time as supplied)
Amendment publication
Original notice; no amendment publication supplied
Amendment reason
Not supplied
Agency reference
CN-SCF2502-001SAX
Approach to market / standing offer
ATM not supplied / Standing offer not supplied
Consultancy
No
Confidentiality as reported
Contract: No; outputs: No
Source observation
CN4148380 · Official weekly workbook ending 2025-05-03 · sheet “Contract Notice Export”, row 47.

The original register may now show later corrections. The card and this observation keep the saved source date.

Preserved source history

All 1 observations in the saved archive. Values are full versions, not amounts to add together. Earlier notices outside the archive are not reconstructed. Repeated notice IDs can have different source publication timestamps and values.

  1. CN4148380 · 2025-05-01 12:59:00

    $235,988.00 · Stirlings to Coast Farmers · source week ending 2025-05-03 · Used in latest-value totals

What these values mean

Each amount is the reported full contract value, including GST where applicable, in nominal Australian dollars. It covers the reported contract period. It is not annual expenditure, cash paid, all government spending or spending in a supplier’s local area. Unexercised future options are not necessarily included.

This snapshot includes every notice in 82 consecutive weekly exports, covering 2 March 2025 to 26 September 2026, retrieved 1 October 2026 (UTC date). AusTender lists only about eighteen months of exports, so weeks before 23 March 2025 are kept from our earlier downloads. Each contract contributes its latest observed version once. Earlier versions remain available in its history; values of successive amendments are never added together. Date filters use that latest observation’s publication date, including amendments, not the contract start date.

Weekly files describe information at extraction. Later corrections, cancelled notices, or contracts with no publication in this archive may be absent. This is not the entire historical AusTender register. Some source timestamps fall just outside their file’s labelled week; their reported dates are retained. Three malformed observations have shifted columns; affected supplier/category fields are marked unavailable. Source dates in 1900 or end dates in the next century are flagged, not interpreted as ordinary durations.

Supplier grouping uses reported ABNs with a valid checksum; it is not independent verification against the business register. Missing or invalid ABNs remain separate by contract. Equal names do not establish equal legal entities. A contract award is not evidence of wrongdoing.

Original weekly exports · Official reporting rules and thresholds · CC BY 3.0 AU. Source: AusTender, Department of Finance, Commonwealth of Australia.